Operating workflow
Normal monitoring, credential reading, door release, repeated traffic, alarm condition, mains outage and restoration.
Security, Tracking & Emergency
Stellova develops door access battery systems and security access backup power solutions around lock actuation, controller and reader loads, standby duration, outage response, charging architecture and the available installation space.
APPLICATION REQUIREMENTS
Access-control loads vary with magnetic locks, strikes, readers, controllers and network equipment. Fail-safe or fail-secure behaviour changes both the energy model and the safety response.
WHAT TO DEFINE
Early estimates are acceptable. Missing values can be refined through the requirements process.
Normal monitoring, credential reading, door release, repeated traffic, alarm condition, mains outage and restoration.
Controllers, readers, magnetic locks or strikes, relays, network devices and sensors.
Required outage hours, expected door cycles, security state, recharge window and reserve.
System voltage, charger, cabinet, terminals, fire-alarm interface, temperature and service access.
ENGINEERING CONSIDERATIONS
Continuous lock current, release pulses and emergency release requirements must be separated before the battery and protection strategy are fixed.
Build usable energy from the complete operating sequence, duty cycle and reserve.
Define lock or strike actuation, multiple simultaneous doors, relays and network startup with current, duration, recovery and temperature rise.
Coordinate the battery, BMS, charger, host controls and controlled shutdown or fault response.
Validate indoor or outdoor temperature, enclosure, ingress, wiring and maintenance conditions before assigning operating limits.
PROJECT-SPECIFIC BATTERY DEFINITION
No fixed reference configuration is published yet. Voltage, capacity, continuous and peak current, charging, BMS logic, communication, protection rating and mechanical interfaces can be customized for the target equipment. Final specifications are subject to the approved project definition.
VALIDATION & PRODUCTION READINESS
Prototype validation should reproduce mains loss, repeated access cycles, simultaneous releases, emergency logic, low-SOC response and recharge, including low-SOC operation, charging and the defined environmental boundary.
Electrical behavior, BMS logic, charging, communication and mechanical fit are checked against the agreed definition.
Environmental, load, runtime or interface tests are selected around the actual product risk and use conditions.
Applicable transport and market evidence is planned and coordinated for the final configuration.
Approved specifications, quality criteria, test requirements and inspection reporting support controlled handoff.
FROM REQUIREMENT TO DELIVERY
Stellova leads requirements analysis, coordinates engineering and qualified production resources, manages applicable certification work, performs production quality inspection and remains the direct technical contact after delivery.
View the Engineering Process ↗DISCUSS YOUR APPLICATION
Provide equipment voltage, measured load data, operating sequence, runtime target, charging method, available battery space, environment and destination market.
Discuss Your Project ↗